by on January 16, 2022
After a period of storage, transport, change of season or long rest periods of electric motors, it is necessary to put them into operation. The correct start-up depends on many things: life schemes, performance protection and control, the number of subsequent repairs, etc. The operation of the machine starts with a commissioning. They should be organized on the basis of official instructions. Each company has its own way of referring to their behavior. But the main work, before the first start o...
243 vizualizări 0 de aprecieri